Monday, January 21, 2008
Fireplace
After months of waiting the fireplace face finally arrived and everything was installed. With the fireplace in, we were able to bring out the guy who will be installing the stone around it as well as the back splash tile. Work will begin on both later this week.
The only catch was that he didn't want to come out until the fireplace was installed so that he had a clear picture of what he was dealing with. Then he came out and said that the fireplace would have to come out. Mostly, he wants to remove it so that he can build a fixed, solid base on which he can face.
This week he will concentrate on the kitchen backsplash. The stone for the fireplace in on order and will take 2-4 weeks to come in.
Subscribe to: