Meanwhile there was still some progress. In the downstairs room, there is an original three door closet structure. The first door (on the left) was a small broom closet. The next one housed the old furnace which we needed to replace shortly after we moved in since what was there was an original from 1956 and slowly dying. We updated the furnace and relocated it further under the house years ago so this one's been empty for awhile. The third contains our hot water heater (more on the relocation of that later). We needed to investigate some venting issues because we have plans to reclaim the space that these closets took up and the heating vent for the room is above door #2. Our inside contractor said that the best way to figure out what will work is to completely remove these closets.
Thursday, January 26, 2017
Goodbye Closets
In the last post I talked about drilling five deep holes and pouring in reinforced cement to create piers down to bedrock which will attach to the foundation. Well, I learned later that they only got three of the five completed. This week, after a number of days of heavy rain, they came out to drill piers 4 and 5. Pier 4 got drilled but had to be lined with slurry to keep it from collapsing in on itself. Drilling pier 5 turned out to be too problematic. They encountered a large rock five feet down and the vibration of drilling through it caused the hole to collapse in on itself. The water table was too high so they decided to pull the crew off the job for a couple weeks and let things dry out before continuing. So our first typical construction delay has already happened.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment